Investment, ROI & Best Locations for an EV Charging Station Franchise in Pune: Setup Guide 2026

Explore EV charging franchise opportunities in Pune, including investment components, ROI factors, high-potential locations, charger selection, electricity requirements, Maharashtra EV Policy and the complete setup process for investors in 2026.

16 min readBy Himanshu sharma

Pune combines a major automotive and manufacturing ecosystem with IT parks, residential expansion, commercial fleets, delivery networks and strategic highway connectivity. For entrepreneurs and infrastructure investors, an EV charging station franchise in Pune can provide a structured route into the city's expanding electric-mobility ecosystem.

But EV charging is an infrastructure business. A premium charger installed at the wrong property can remain underutilised regardless of the strength of the wider EV market.

Commercial performance depends on factors such as:

  • Local EV demand

  • Electrical capacity

  • Charger utilisation

  • Energy delivered per session

  • Vehicle dwell time

  • Parking

  • Site accessibility

  • Electricity cost

  • Property economics

  • Charger uptime

  • Fleet demand

  • Nearby competition

Investors should therefore validate the demand and property before deciding which charger to purchase.

Why Pune Is an Important EV Charging Market

Pune has several characteristics that make it relevant for commercial EV charging.

The city and its surrounding industrial region combine:

  • Automotive manufacturing

  • Technology parks

  • Corporate offices

  • Industrial estates

  • Logistics operations

  • Delivery fleets

  • Residential communities

  • Shopping and hospitality destinations

  • Mumbai–Pune intercity movement

  • Pune–Bengaluru highway traffic

Maharashtra's current electric-mobility framework further strengthens the long-term charging-infrastructure case.

The official Maharashtra Electric Vehicle Policy 2025 sets out measures for developing charging infrastructure across the state.

Among its charging-infrastructure measures, the policy provides for charging facilities at approximately 25 km intervals along state and national highways. It also provides for at least one fast charging station at existing and new fuel pumps on state and national highways, subject to technical feasibility.

For Pune investors, this is important because the opportunity is not limited to city-centre charging. Highway and intercity charging corridors are also part of Maharashtra's broader infrastructure strategy.

What Is an EV Charging Franchise?

An EV charging station franchise in Pune allows an investor or property owner to participate in charging infrastructure while using some combination of an established charging company's brand, hardware ecosystem, charging software, operating processes and network.

Common charging-business structures include:

  • FOCO — Franchise Owned, Company Operated

  • FOFO — Franchise Owned, Franchise Operated

  • Revenue Share

  • Location-host partnership

  • Charging-as-a-Service

  • Fleet charging partnership

These structures should not be assumed to have identical economics.

Before investing, determine:

  • Who owns the charger?

  • Who pays for electrical infrastructure?

  • Who operates the station?

  • Who pays the electricity bill?

  • Who maintains the charger?

  • Who manages customer billing?

  • How is Revenue Share calculated?

  • What happens when the agreement ends?

SpeedCharge's EV charging franchise business guide explains the differences between franchise structures and the due-diligence questions investors should ask before committing capital.

Franchise vs Independent EV Charging Station

Investors can either join an established charging network or develop an independent charging business.

Factor

Franchise / Network Model

Independent Station

Brand

Existing charging brand

Build your own

Charger selection

Usually standardised

Investor selects

Software

Typically integrated

Must be arranged

Customer payments

May be integrated

Investor integrates

Monitoring

Network backend

Own CSMS required

Maintenance

May be supported

Investor responsible

Operations

Agreement dependent

Investor manages

Customer discovery

Network may support

Self-managed

Technical workload

Generally lower

Generally higher

Flexibility

Contract dependent

Greater control

Neither model is automatically superior.

An independent model can provide greater operational control, while a managed franchise can reduce the technical and operational workload for an investor who does not already operate charging infrastructure.

EV Charging Station Investment in Pune

The total investment required for an EV charging station franchise in Pune should be calculated using the complete commissioned project rather than only the charger purchase price.

Investment Component

What It Can Include

EV charger

AC or DC charging hardware

Electricity connection

New connection/load enhancement

Transformer

Where technically required

Electrical panels

Distribution and protection

Cabling

Power and communication

Earthing

Electrical safety system

Civil works

Foundation, trenching and charging bays

Installation

Equipment installation and commissioning

Software

CSMS/backend

Connectivity

SIM/internet/networking

Branding

Signage and bay markings

Property

Rent, lease or Revenue Share

Maintenance

Preventive and corrective support

Operations

Station and customer management

The electrical condition of the site can materially change total CAPEX.

A property with inexpensive rent but expensive transformer or load-enhancement requirements may ultimately cost more than a better-equipped site with a higher rental value.

SpeedCharge's EV charging infrastructure financing guide explains the capital and financing variables that should be evaluated before deployment.

AC vs DC Fast Charging in Pune

The correct charger depends on the customer and property.

AC Charging

AC charging is generally more suitable where vehicles remain parked for longer periods.

Potential applications include:

  • Apartment complexes

  • Offices

  • IT parks

  • Hotels

  • Hospitals

  • Corporate campuses

  • Long-stay parking

DC Fast Charging

DC fast charging becomes more relevant where drivers require faster turnaround.

Potential applications include:

  • Public charging stations

  • Fuel stations

  • Taxi hubs

  • Fleet depots

  • Logistics areas

  • Highway locations

  • Commercial corridors

A higher charger rating is not automatically a better investment.

SpeedCharge's DC vs AC EV charging guide explains how charging speed, vehicle dwell time and business use case should influence charger selection.

Best Locations for EV Charging Stations in Pune

The performance of an EV charging station franchise in Pune depends heavily on matching the charging use case with the property.

Potential areas and corridors worth evaluating include:

Hinjawadi

Hinjawadi's technology parks, offices, residential developments and employee traffic can create opportunities for workplace, destination and fleet charging.

Baner and Balewadi

These areas combine residential communities, offices, hospitality and commercial activity.

Potential charging models include:

  • Destination charging

  • Workplace charging

  • Residential charging

  • Public charging

Wakad

Wakad's residential development and proximity to major employment and highway corridors can make selected commercial properties worth evaluating.

Kharadi

Kharadi has a substantial technology-office and residential ecosystem that may support workplace and destination charging.

Viman Nagar

Commercial activity, hotels, residential properties and proximity to the airport create multiple potential charging use cases.

Hadapsar and Magarpatta

Corporate campuses, residential density and commercial activity can create workplace and public-charging demand.

Pimpri-Chinchwad

Pimpri-Chinchwad's manufacturing, industrial, residential and commercial ecosystem can support both passenger and commercial EV charging models.

Chakan

Chakan's industrial and automotive ecosystem can be relevant for fleet, logistics and commercial-vehicle charging.

Pune–Mumbai Corridor

The Mumbai–Pune corridor is strategically important for intercity EV movement and fast-charging infrastructure.

Pune–Bengaluru Corridor

Suitable highway properties can potentially serve long-distance passenger and commercial EV traffic.

These areas are site-investigation categories, not guaranteed profitable locations.

Use SpeedCharge's EV charging station site selection guide before committing to a property.

Pune EV Charging Site Selection Scorecard

Site Factor

Priority

What to Evaluate

Local EV demand

Very High

Actual EV movement

Electrical capacity

Very High

Available sanctioned load

Fleet demand

High

Taxi, delivery and commercial EVs

Entry/exit

High

Safe and convenient access

Parking

High

Dedicated charging bays

Dwell time

High

Match with charging speed

Visibility

High

Road visibility and signage

Competition

High

Nearby chargers and utilisation

Operating hours

Medium–High

Customer accessibility

Amenities

Medium

Food, washroom and waiting space

Safety

High

Lighting and surveillance

Expansion capacity

High

Space and future electrical load

A strong charging location combines EV demand + power + parking + access + viable economics.

High general traffic alone is not enough.

Maharashtra EV Policy 2025 and Charging Infrastructure

Maharashtra's current EV policy makes charging infrastructure a significant part of the state's electric-mobility strategy.

The policy provides for measures including:

  • Charging facilities along state and national highways

  • Fast charging at technically feasible fuel pumps

  • Fast charging at MSRTC bus stations and bus stops, subject to technical feasibility

  • A framework for supporting high-power DC charging infrastructure

  • Charging provisions in relevant new buildings

  • Promotion of sustainable transport corridors

The policy specifically identifies Mumbai–Pune connectivity as part of Maharashtra's sustainable transport-corridor approach.

For an investor, this means future competition and network expansion should form part of site due diligence.

Do not evaluate a property only against the chargers operating nearby today.

Also consider where charging infrastructure is likely to expand during the investment period.

EV Charging Rules in India

Pune charging projects must comply with India's national charging framework.

The Ministry of Power's Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure 2024 apply to manufacturers, owners and operators of charging infrastructure in private, semi-restricted and public locations.

The framework covers locations such as:

  • Private parking

  • Offices

  • Educational institutions

  • Hospitals

  • Group Housing Societies

  • E-bus depots

  • Commercial complexes

  • Railway stations

  • Petrol pumps

  • Airports

  • Metro stations

  • Municipal parking

  • Highways

  • Expressways

The national framework is intended to make charging safe, reliable and accessible while improving the viability of charging stations and facilitating electricity connections.

For a practical project-level explanation, review SpeedCharge's EV charging station guidelines in India.

Is an Electricity Distribution Licence Required?

Operating an EV charging station does not require the charging operator to become an electricity distribution licensee merely for providing vehicle-charging services.

However, de-licensed does not mean compliance-free.

A project may still involve:

  • Electricity connection procedures

  • Sanctioned load

  • Electrical safety

  • Earthing

  • Metering

  • Charger standards

  • Property permissions

  • Fire safety

  • DISCOM requirements

  • Applicable local permissions

The charging station should therefore be treated as a professional electrical-infrastructure project.

EV Charger Standards and Specifications

Commercial charging hardware should be selected according to vehicle compatibility, charging demand and applicable technical requirements.

The official Bureau of Energy Efficiency EV Charging Infrastructure Specifications provides charging specifications under the Ministry of Power framework.

Depending on the use case, investors should evaluate:

  • Connector type

  • Vehicle compatibility

  • Charger capacity

  • Rated output voltage

  • Number of charging guns

  • Communication capability

  • Safety

  • Backend compatibility

  • Future vehicle mix

Do not choose hardware only because it has the highest kW rating.

The charger should match the site's likely customers.

Maharashtra EV Charging Electricity Tariff

Electricity cost is one of the most important operating variables in a charging business.

The Maharashtra Electricity Regulatory Commission's tariff framework contains dedicated categories for EV charging stations.

Investors should use the official Maharashtra Electricity Regulatory Commission to verify the tariff applicable to their specific distribution licensee, connection category and financial year before building the station's financial model.

Depending on the project, confirm:

  • LT or HT connection

  • Applicable EV tariff category

  • Energy charge

  • Wheeling charge

  • Demand/fixed charge where applicable

  • Time-of-day provisions

  • Taxes and duties

  • Contract demand

  • Metering requirements

Do not calculate a multi-year ROI using an old tariff screenshot or an electricity price copied from another state.

How EV Charging Station ROI Works

ROI from an EV charging station franchise in Pune depends primarily on total CAPEX, energy throughput, operating expenses and the commercial structure.

There is no responsible universal ROI percentage that can be guaranteed for every site.

A simplified revenue framework is:

Charging Revenue = Billable Energy Delivered × Effective Charging Price

The project's retained economics then depend on expenses such as:

  • Electricity

  • Property rent

  • Revenue Share

  • Maintenance

  • Software

  • Connectivity

  • Payment processing

  • Staff

  • Finance costs

  • Taxes

  • Downtime

The key metric is therefore billable energy throughput, not merely installed charger capacity.

SpeedCharge's EV charging business model guide explains how utilisation, site economics, charging revenue and operating costs affect profitability.

Why Charger Utilisation Matters More Than Charger Size

Consider two hypothetical Pune sites.

Metric

Site A

Site B

Charger capacity

120 kW

60 kW

Relevant EV demand

Low

Strong

Entry/exit

Difficult

Easy

Fleet activity

Limited

Regular

Visibility

Weak

Good

Uptime

High

High

Utilisation

Low

Higher

Commercial potential

Limited

Potentially stronger

A 120 kW charger has greater power capacity, but greater capacity does not guarantee greater revenue.

Installed kW = charging capacity

Billable kWh = energy actually sold

That distinction is fundamental when analysing charging-station economics.

Major Revenue Drivers in Pune

1. Daily Charging Sessions

How many paying EVs can realistically use the property?

2. Energy Delivered per Session

Different vehicle categories can require significantly different amounts of energy.

3. Charger Utilisation

How frequently is the charging asset delivering paid energy?

4. Electricity Cost

Power procurement directly affects retained economics.

5. Property Cost

High fixed rent increases the station's break-even requirement.

6. Uptime

A charger that is unavailable cannot sell energy.

7. Fleet Demand

Taxi, logistics, delivery and commercial fleets can potentially create recurring charging demand.

8. Customer Dwell Time

Charging speed should match how long customers naturally remain at the property.

Public Charging vs Fleet Charging in Pune

Pune investors should not assume that every charging station needs to target the same customer.

Charging Model

Main Customer

Key Requirement

Public charging

Passenger EV drivers

Access + visibility

Workplace charging

Employees

Long dwell time

Fleet charging

Commercial fleets

Predictable energy demand

Destination charging

Mall/hotel visitors

Natural parking duration

Highway charging

Intercity drivers

Fast charging + amenities

Residential charging

Apartment residents

Long/overnight dwell

Taxi charging

High-mileage taxis

Fast turnaround

Industrial charging

Commercial vehicles

Fleet access + power

Pune's mix of IT parks, industrial areas, logistics operations and residential clusters makes customer segmentation particularly important.

PM E-DRIVE and Public Charging Infrastructure

India's PM E-DRIVE programme also includes EV public charging infrastructure.

Investors can review the official PM E-DRIVE EV Public Charging Station Guidelines published by the Ministry of Heavy Industries.

The operational framework covers public charging deployment under the scheme and includes location categorisation, technical requirements and implementation mechanisms.

However, government support for public charging infrastructure should not be interpreted as an automatic subsidy for every private franchise.

Eligibility depends on:

  • Location category

  • Eligible entity

  • Nodal agency

  • Project structure

  • Applicable guidelines

  • Technical configuration

Do not add subsidy income to an ROI calculation until project-specific eligibility has been confirmed.

Franchise Due-Diligence Checklist

Before signing an agreement for an EV charging station franchise in Pune, verify the commercial and operational responsibilities.

Question

Why It Matters

Who owns the charger?

Determines asset ownership

Who owns electrical infrastructure?

Important when the agreement ends

Who pays electricity?

Affects retained economics

Who operates the station?

Determines investor workload

Who maintains the charger?

Influences uptime

What is the Revenue Share?

Determines investor payout

How is Revenue Share calculated?

Prevents ambiguity

Is a minimum payout contractual?

Must be documented

Who handles customer billing?

Operational responsibility

Who controls charging data?

Platform dependency

Who pays for major repairs?

Affects operating risk

What happens during downtime?

Defines responsibility

What is the agreement term?

Determines commitment

What happens at termination?

Important for asset recovery

Investment decisions should be based on the executed agreement rather than only promotional material.

SpeedCharge Franchise Model

SpeedCharge provides structured charging-infrastructure opportunities for investors and eligible property owners.

Its current franchise proposition includes a FOCO — Franchise Owned, Company Operated — model, subject to the final project and executed agreement.

Under this structure, the investor owns the charging infrastructure while SpeedCharge manages specified operating functions.

Depending on the applicable project and agreement, these can include:

  • Site feasibility

  • Electrical planning

  • Civil execution

  • Charger installation

  • Charging software

  • Station monitoring

  • Customer billing

  • Preventive maintenance

  • Fault management

  • Network operations

  • Investor reporting

The exact commercial terms, investment, Revenue Share and responsibilities should be confirmed in the applicable proposal and executed agreement.

Investors can review the current SpeedCharge EV charging station franchise programme before requesting site-specific evaluation.

Step-by-Step EV Charging Station Setup in Pune

Step 1: Identify the Customer Segment

Determine whether the site will primarily serve:

  • Passenger EVs

  • Corporate employees

  • Taxis

  • Delivery fleets

  • Logistics operators

  • Commercial vehicles

  • Apartment residents

  • Hotel visitors

  • Highway travellers

Step 2: Measure Local EV Demand

Observe actual EV movement and existing charging behaviour.

Do not rely only on national EV-growth statistics.

Step 3: Shortlist Properties

Compare:

  • Access

  • Visibility

  • Parking

  • Fleet activity

  • Dwell time

  • Competition

  • Property economics

Step 4: Conduct Electrical Feasibility

Verify:

  • Existing sanctioned load

  • Spare capacity

  • Required load enhancement

  • LT/HT requirement

  • Transformer capacity

  • Cable route

  • Metering

  • Earthing

  • Future expansion

Step 5: Choose Charger Configuration

Match charger capacity with:

  • Customer type

  • Vehicle segment

  • Dwell time

  • Grid capacity

  • Expected daily energy

  • Expected utilisation

Step 6: Calculate Complete Project CAPEX

Include hardware, electrical infrastructure, civil work, installation, software, networking and property-related expenses.

Step 7: Finalise Commercial Terms

Confirm ownership, electricity responsibility, Revenue Share, maintenance, operations, settlement and exit provisions.

Step 8: Install and Commission

Typical activities include:

  • Foundation

  • Electrical panels

  • Cabling

  • Earthing

  • Charger installation

  • Networking

  • Backend integration

  • Testing

SpeedCharge's EV charging station setup guide explains the complete infrastructure workflow.

Step 9: Monitor Performance

After launch, monitor:

  • Charging sessions

  • kWh delivered

  • Charger utilisation

  • Uptime

  • Peak periods

  • Repeat users

  • Operating expenses

Suitable Charging Business Models for Pune

Location Type

Potential Charging Model

IT park

Workplace charging

Corporate campus

Employee + fleet charging

Apartment complex

Residential charging

Mall

Destination charging

Hotel

Destination charging

Taxi hub

DC fast charging

Delivery hub

Fleet charging

Industrial area

Commercial fleet charging

Fuel station

Public fast charging

Highway property

Intercity fast charging

Logistics hub

Fleet/commercial charging

The customer use case should determine the station configuration.

A hotel guest, office employee and intercity taxi driver have very different charging requirements.

How to Analyse EV Charging Competition in Pune

Before finalising the property, map chargers within the site's realistic catchment.

Evaluate:

  • Number of nearby stations

  • Number of charging guns

  • AC/DC availability

  • Charger capacity

  • Connector compatibility

  • Charging price

  • Operating hours

  • Parking

  • Uptime

  • Customer ratings

  • Queueing

  • Fleet usage

Competition is not automatically negative.

Frequently used chargers can demonstrate established demand.

However, multiple underutilised stations may indicate weaker charging demand or oversupply.

Common EV Charging Investment Mistakes

Buying the Charger First

The site and customer use case should determine charger configuration.

Choosing a Site Only Because Rent Is Cheap

Weak demand can make inexpensive property commercially expensive.

Confusing General Traffic With EV Demand

Vehicle traffic does not equal paid charging sessions.

Ignoring Electrical Upgrade Costs

Transformer, cabling and load-enhancement requirements can materially change CAPEX.

Oversizing the Charger

Higher power does not create additional customers.

Ignoring Fleet Opportunities

Predictable fleet demand can materially change utilisation characteristics.

Ignoring Uptime

Hardware reliability directly affects revenue.

Assuming Subsidies Are Guaranteed

Government support programmes have specific eligibility requirements.

Using Aggressive ROI Forecasts

Financial projections should include conservative utilisation scenarios.

Is Pune a Good City for an EV Charging Business?

Pune has several structural characteristics that support the long-term charging opportunity:

  • Automotive ecosystem

  • Manufacturing clusters

  • IT employment

  • Corporate campuses

  • Industrial areas

  • Logistics activity

  • Delivery fleets

  • Residential expansion

  • Mumbai–Pune connectivity

  • Pune–Bengaluru connectivity

  • Maharashtra EV-policy support

But a strong city does not guarantee a strong charging site.

A better evaluation framework is:

Relevant EV Demand × Billable Energy × Uptime × Retained Economics

rather than:

City Population × Charger Capacity

The project should remain commercially logical even when conservative utilisation assumptions are used.

Franchise or Independent Charging Business?

A franchise/network model can be suitable when an investor wants:

  • Existing charging technology

  • Software

  • Customer billing

  • Network monitoring

  • Maintenance support

  • Operational support

  • Established customer ecosystem

An independent business may be suitable when the investor already has:

  • Electrical expertise

  • Charger procurement capability

  • CSMS/backend technology

  • Maintenance teams

  • Customer acquisition

  • Network operations experience

Investors should evaluate operational capability alongside capital investment.

Final Investment Checklist

Before committing capital to an EV charging station franchise in Pune, verify:

  • Property ownership or legal tenure

  • Relevant EV demand

  • Nearby charging competition

  • Fleet opportunities

  • Parking availability

  • Entry and exit

  • Electrical capacity

  • LT/HT requirement

  • Charger configuration

  • Complete project CAPEX

  • Electricity tariff

  • Property expense

  • Maintenance responsibility

  • Software/backend costs

  • Revenue Share mechanism

  • Settlement process

  • Uptime responsibility

  • Agreement period

  • Termination provisions

  • Future expansion potential

A charging station should be justified by the economics of the specific property, not simply by Pune's overall EV growth.

How SpeedCharge Can Support Pune Investors

Commercial EV charging requires coordination between property, grid infrastructure, charger hardware, software and operations.

Depending on the applicable project, SpeedCharge can support areas including:

  • Site assessment

  • Charger planning

  • Electrical execution

  • Civil works

  • Charger installation

  • Charging software

  • Network monitoring

  • Driver billing

  • Operations

  • Technical maintenance

Property owners who want to host charging infrastructure without following a conventional franchise route can explore SpeedCharge location partnership opportunities.

Investors seeking a managed charging model can evaluate the SpeedCharge franchise programme.

Conclusion

An EV charging station franchise in Pune can provide a structured opportunity for investors seeking exposure to India's expanding electric-mobility infrastructure.

Pune combines automotive manufacturing, IT employment, industrial clusters, commercial fleets, residential expansion and important intercity corridors. Maharashtra's EV Policy 2025 further strengthens the strategic importance of charging infrastructure across the state.

But Pune's overall EV opportunity cannot substitute for site-level due diligence.

A sustainable charging project requires:

Right Location + Real EV Demand + Electrical Feasibility + Appropriate Charger + High Uptime + Sustainable Commercial Terms

The key principle is straightforward:

Validate demand and electrical infrastructure first. Choose the charger and investment model only after the site's commercial feasibility is clear.

Frequently Asked Questions

1. How can I start an EV charging franchise in Pune?

Start by identifying a suitable property, analysing local EV demand, checking electrical feasibility and comparing charging-franchise structures. Charger selection should follow the site's technical and commercial assessment.

2. How much investment is required for an EV charging station in Pune?

There is no universal project cost. Investment depends on charger capacity, electrical connection, transformer requirements, panels, cabling, civil works, software, installation and property economics.

3. Is an EV charging franchise profitable in Pune?

It can be commercially viable at an appropriate site, but profitability depends on utilisation, billable energy, electricity costs, property expenses, maintenance, uptime and the commercial agreement.

4. Which Pune areas can be considered for EV charging?

Hinjawadi, Baner, Balewadi, Wakad, Kharadi, Viman Nagar, Hadapsar, Pimpri-Chinchwad, Chakan and suitable highway-linked properties can be investigated. Individual properties still require technical and demand feasibility.

5. Is a licence required to operate an EV charging station?

An electricity distribution licence is not required merely for providing EV charging services. Applicable electricity, safety, equipment, property and local requirements must still be followed.

6. Should I install an AC or DC charger in Pune?

AC charging can suit offices, apartments and hotels with longer parking periods. DC fast charging can be more appropriate for public stations, taxis, fleets and highway locations requiring faster turnaround.

7. Can I install a 120 kW EV charger in Pune?

Potentially, subject to sanctioned load, transformer capacity, upstream electrical infrastructure, property conditions, vehicle compatibility and expected charging demand. Electrical feasibility should be completed first.

8. Does Maharashtra support EV charging infrastructure?

Yes. Maharashtra EV Policy 2025 contains specific charging-infrastructure measures, including highway charging expansion and fast-charging provisions at certain locations subject to technical feasibility.

9. What determines EV charging station ROI?

ROI depends on total CAPEX, billable energy delivered, utilisation, electricity expense, property cost, maintenance, Revenue Share, financing, uptime and other operating costs. Charger capacity alone does not determine ROI.

10. What should I check before selecting an EV charging franchise?

Evaluate asset ownership, hardware, software, electricity responsibility, operations, maintenance, Revenue Share, billing, payout calculations, downtime responsibility, agreement duration and termination provisions before investing.

Himanshu sharma

Himanshu sharma

Himanshu sharma writes for SpeedCharge on EV charging infrastructure, clean mobility technology, policy and charging economics in India.

View Author Profile & Articles →